Operations Overview
Solar Output
47.2
kW
▲ 2.1%
/ 52 kW capacity
O₂ Level
21.1
%
▬ steady
nominal 20.8-21.5
H₂O Recycling
98.7
%
▲ 0.3%
filter replaced 6d ago
Regolith Proc
12.4
t/day
▼ 1.8%
target 14.0 t/day
Power Generation
90.8% Capacity
| Source | Status | Output |
|---|---|---|
| Solar Array Alpha | Nominal | 23.8 kW |
| Solar Array Beta | Nominal | 22.1 kW |
| RTG Backup Unit | Standby | 1.3 kW |
| Battery Reserve | Charging | 78% |
Life Support
All Nominal
Surface Operations — Shackleton Crater Region
Live
SHACKLETON BASE
Rover-1 (EVA)
Rover-2 (Survey)
Solar Farm A
Regolith Site 3
Base
Active Rover
On Task
Infrastructure
Active Alerts
3 unresolved
Regolith processing output below target threshold
14m ago
EVA-07 duration approaching 4h soft limit
31m ago
Comm window TDRS-East unavailable — routed via TDRS-West
1h 12m ago
Crew Manifest — Expedition 12
6 personnel
EC
Cmdr. Elena Chen
Mission Commander
HR 68 / BP 118/76
MK
Dr. Marcus Kovalev
Flight Surgeon
HR 72 / BP 122/80
AJ
Lt. Amara Jelani
EVA Specialist
HR 84 / O₂ 98%
TN
Eng. Takeshi Nakamura
Systems Engineer
HR 79 / O₂ 97%
SK
Dr. Sofia Kessler
Geologist / ISRU Lead
HR 56 / sleep cycle
PL
Eng. Priya Lakshmi
Power Systems / Comms
HR 65 / BP 110/72
Resupply Timeline
Next: T-47d
Artemis V — Cargo Module C
Water filters, medical supplies, replacement solar cells. 2,400 kg manifest delivered.
2027-01-18
Artemis VI — Crew Rotation
Expedition 12 crew arrived. Expedition 11 departed. Habitat expansion module B installed.
2027-02-22
Artemis VII — Heavy Cargo
Regolith processor upgrade, rover battery packs, ISRU pilot plant components. 4,100 kg manifest.
2027-04-30
Artemis VIII — Science Payload
Deep drill assembly, seismometer network, radiation shelter materials. Planning phase.
2027-07-15