All Systems Nominal | Crew 6/6 | EVA Active 2 crew
MET 287:14:32:07 | UTC 2027-03-14 09:32:07
Solar Output
47.2 kW
▲ 2.1% / 52 kW capacity
O₂ Level
21.1 %
▬ steady nominal 20.8-21.5
H₂O Recycling
98.7 %
▲ 0.3% filter replaced 6d ago
Regolith Proc
12.4 t/day
▼ 1.8% target 14.0 t/day
Power Generation 90.8% Capacity
Source Status Output
Solar Array Alpha
Nominal 23.8 kW
Solar Array Beta
Nominal 22.1 kW
RTG Backup Unit
Standby 1.3 kW
Battery Reserve
Charging 78%
Life Support All Nominal
Surface Operations — Shackleton Crater Region Live
Lunar surface terrain
SHACKLETON BASE
Rover-1 (EVA)
Rover-2 (Survey)
Solar Farm A
Regolith Site 3
Base
Active Rover
On Task
Infrastructure

Active Alerts

3 unresolved
Regolith processing output below target threshold
PROC-2741 Subsystem: Regolith Severity: CAUTION
14m ago
EVA-07 duration approaching 4h soft limit
EVA-07-TIMER Subsystem: Crew Safety Severity: ADVISORY
31m ago
Comm window TDRS-East unavailable — routed via TDRS-West
COMM-4102 Subsystem: Communications Severity: INFO
1h 12m ago
Crew Manifest — Expedition 12 6 personnel
EC
Cmdr. Elena Chen
Mission Commander
ON DUTY
HR 68 / BP 118/76
MK
Dr. Marcus Kovalev
Flight Surgeon
ON DUTY
HR 72 / BP 122/80
AJ
Lt. Amara Jelani
EVA Specialist
EVA
HR 84 / O₂ 98%
TN
Eng. Takeshi Nakamura
Systems Engineer
EVA
HR 79 / O₂ 97%
SK
Dr. Sofia Kessler
Geologist / ISRU Lead
REST
HR 56 / sleep cycle
PL
Eng. Priya Lakshmi
Power Systems / Comms
ON DUTY
HR 65 / BP 110/72
Resupply Timeline Next: T-47d

Artemis V — Cargo Module C

Water filters, medical supplies, replacement solar cells. 2,400 kg manifest delivered.

2027-01-18

Artemis VI — Crew Rotation

Expedition 12 crew arrived. Expedition 11 departed. Habitat expansion module B installed.

2027-02-22

Artemis VII — Heavy Cargo

Regolith processor upgrade, rover battery packs, ISRU pilot plant components. 4,100 kg manifest.

2027-04-30

Artemis VIII — Science Payload

Deep drill assembly, seismometer network, radiation shelter materials. Planning phase.

2027-07-15
Astronaut in space suit
Expedition 12 // Shackleton Base

Humanity's First Permanent Presence Beyond Earth

Six crew members. 287 days of continuous operations. Building the infrastructure for a civilization that endures.